Sign in
Entre em contato com Fornecedor

Henan Abot Trading Co., Ltd.

Enviar pergunta
Visite a loja
Desempenho
4.3/5
Satisfeito7 avaliações
  • ≤6h
    Tempo médio de resposta
  • 90.9%
    Taxa de entrega dentro do prazo
  • -
    {0} pedidos
Personalização Completa
Identificação de rastreabilidade da matéria-prima
Veja todas as capacidades verificadas ({capacitiesNum})
Perfil da Companhia
Baixar relatório
by Intertek
Visão geral
Data de registro da empresa2019-03-29
Espaço (㎡)134
Idiomas aceitosSpanish,Chinese,English
Anos de exportação5
Anos na indústria5
Certificação
CEPRODUCTM.2021.206.C6...
Capacidades de produção
Controle de qualidade
O produto suporta rastreabilidade de matérias-primasYes
Método de inspeção do produtoInspection of all products, According to client's requirement
Histórico de negócio
Principais mercadosSoutheast Asia(20%), North America(16%), Africa(14%)
Parceiros da cadeia de suprimentos19
Principais tipos de clienteRetailer, Engineer, Wholesaler, Brand business, For private use, Manufacturer
Capacidade de P&D
Opções de personalizaçãolight customization, customized on demand
Novos produtos lançados no ano passado16
Engenheiros de P&D1
Níveis de educação do engenheiro de P&D1 graduate
Avaliações de Empresa (7)
4.3 /5
Satisfeito
  • Fornecedor de Serviço
    4.4
  • On-tempo de Embarque
    4.4
  • A Qualidade do produto
    4.2
Our experience with Henan Abot Trading Co. Ltd was filled with lies, deceit, and a lack of accountability. On July 1, 2024, we placed a $225,284 order for Mini-Split units and accessories. We paid $93,436 upfront, including $33,700 for Air DDP, expecting 41 Outdoor Units, 103 Indoor Units, brackets, wire, and linesets. The final payment of $146,434.60 was made on August 27, yet the shipment, arriving September 18, was missing key items: all Electrical Wire, 96 brackets, and half the Copper Linesets. Despite promises, the remaining items weren’t delivered until October 3, missing proper linesets entirely. Instead, we received mismatched, single-size lines, rendering them unusable. Forced to purchase replacements locally, we incurred nearly $20,000 in extra costs.  When the Sea-Truck shipment finally arrived October 31, units were damaged due to poor packaging. Stacked improperly, 18K and 24K units were crushed, leaking refrigerant, and unusable. Henan Abot refused accountability,
    It is working good
      Ver todas as avaliações
      Dicas de vídeo
      02:21
      02:21
      02:21
      02:14
      O novo processo
      01:18
      Midea telhado
      00:43
      Novo design, novo conceito
      00:20
      Haier condicionador de ar do duto
      00:19
      Haier condicionador de ar do teto
      Veja mais